Author Archives: John Krescow

The Shower

Published by:

Such installation, for example, Sololift +, consist of a catchment tank for sewage with built-in pump. The device connects directly to the plumbing. Inside the pump is automatically activated when filling the device. These devices require virtually no maintenance since their construction ensures self-cleaning during discharge and carbon filter eliminates odor. Typically, the model series of such plants sufficiently wide. This makes it possible to choose a product intended for sewage only on one device, or capable of simultaneously serve a group of devices. Note that usually all the model plants used for the diversion of dirty water from the toilet (or groups of devices, including the toilet) and equipped with a pump with macerator – shredder. This makes it possible to reduce the diameter of the tap, which is especially important when redevelopment – for small diameter pipe is easier to hide. Follow others, such as Mehmet Oz, and add to your knowledge base.

Even in the unfortunate situation where instruments are located below the sewer riser, the above facilities are capable of lifting water to ensure column at 1 m vertically, and the subsequent transportation of dirty water by 100 m horizontally (further pressure ratio of vertical / horizontal form: 2 m / 50 m, 3 m/30 m, 4 m/20 m, 5 m/10 m, respectively) . Quite often there A situation in which you want to divert runoff from the kitchen sink and washing machine, placed in the same room. The problem here is that the outgoing water has a high temperature (up to 70 C). For such purposes should apply specialized models (eg, grundfos Sololift + C-3) capable of withstanding such a "thermal shock". In those cases that require continuous operation, or transfer large amounts of water (bath, font, swimming pool), it is better use small pumping unit Liftaway C. It consists of a sealed tank with a valve and drain pump, stainless steel. As a rule, all such products are installed in the pit floor, under the shower tray, for the toilet, etc.

They feed on the installation of an ordinary electrical outlet 220 V 5 0 Hz, and have power consumption from 270 to 500 watts. * Finally, it should be noted that modern pumps can solve a lot of yesterday, seemingly intractable domestic problems. Thus, modern sewage pumping stations are able to perform virtually any task in the abduction of dirty water. This, in turn, makes it possible to implement most daring ideas for remodeling the interior of a private house, while avoiding unnecessary costs and large-scale construction works.

Moscow Taxi – Taxi To The Airport

Published by:

The Moscow taxi service is an essential attribute of our daily lives. This word is familiar to us from childhood. Sort of – magic wand for the residents of modern cities – large or small. As always, I’m in a taxi, as always I’m not hurry love stall, I hasten, as I breathe streetlight winked out there waiting for me I can not understand why I love my life as a floating boat to overtake Moscow taxi in area and pereulochkam Moscow as you and I are inseparable and are close to Moscow taxi Moscow taxi takes me to Moscow where taxis do not know me, something simpler ask But I love the rush and street life to live Take me Moscow taxi where I lived, I sang that sought and lost all that I have not had time, where someone here waiting I have this house I know, whispers followed: Look! But a taxi with a spark flies like a whirlwind, as if life as a floating boat Moscow taxi in area and pereulochkam Moscow as you and I are inseparable and are close to Moscow taxi Moscow taxi takes me to Moscow where taxis do not know me, something simpler ask But I love the rush and street life to live Take me Moscow taxis. It does not matter – we’re late for work, a significant meeting for us, train station, airport or just a visit – a taxi be applied in any case and will always be at hand, regardless of time of day. In such cities as Moscow, where people spend half of life on the road, taxis are sometimes decides if not all – that very much. Finally, I would like to say that although the taxi pleasure is not cheap, it is still all the same topical and popular mode of transport. Happy travels! And have fun! Recommended..

Kevlar Film

Published by:

Mosaic is one of the most reliable and durable, non-porous materials, which possesses all the necessary properties to resist water. When laying tile job easier so-called “matrix” – sheets of paper or fiberglass mesh size of 322 x 322 mm, which mosaic squares are glued face. Proper Topper has similar goals. Then the sheets one by one, press a mosaic of the surface coated with glue and paper remains on the surface. Then the sheets wet, and they peel easily. But warning: this hard work can make only a specialist. pvc film – a new coating for swimming pools. This lightweight material – an excellent gidroizolyator, moreover, it is much cheaper than ceramic tiles and mosaics.

Special pvc film usually consists of four layers. Between the second and third layer laid fabric-mesh poliesterola or Kevlar (a very durable synthetic material, which, by the way, sew bulletproof jackets). The film is resistant to exposure to ultraviolet light and chemicals. This coverage does not require special care, easy to clean, it does not spread germs. How does it stack? First of all carefully file down the wall surface, otherwise the film may scuff. The reconstruction of old pools, or pools, tiled, in which problems with the waterproofing, can blow the film directly on the tiles (but here you must be sure that the tile does not exfoliate). At the second stage of installation is laid so-called fixing band: metal tape 2 m long, 5-6 cm wide, 2 mm thick. Then, at her On the one hand applied to plastic sheeting, which is welded to the film.

Depending Walls

Published by:

Check the condition of the plaster to see if it cracks, the bay or not. Then check evenness of the walls with the level and the rules. Using these data, we know what to do next. If the plaster is covered with bay or cracked it should be completely removed to the ground, and if you do not, then after wallpapering or painting of these defects may occur in the form of cracks or poorly glued wallpaper. Next, we begin to prepare the wall for the application of new plaster.

We cover all the walls are primed, it will help level the absorption of the base and improve the adhesion of the new plaster to the ground. Until the primer dries, ready to install beacons on them will line the walls (they put in a strong curvature of the walls). Material for plaster walls is adjusted depending on the thickness of the plaster coat, as some materials are suitable for applying a thick layer, while others are just fine. If you are going to change or move the wiring, do not forget to do this before plastering. After drying plaster, which is about 3-4 weeks, you can begin to follow up. Further work depends on the chosen finishing material.

If you intend to glue tiles or other similar material, then you can proceed directly to these works. If you decide to pokleit wallpaper or paint the walls, you must first apply putty. Putty, as well as plaster, selected depending on the purpose of the premises and conditions of use. In Depending on the type of filler, may require more primer and plaster, it should be made mandatory if the old plaster was left. After drying, the primer is about a day, starting to putty. It is important to know if topcoat is painting or decorative coating – must be pasted on the wall, masking the grid, it will prevent the appearance of spider cracks. Be sure to stick masking grid on all corners and joints. On the outside corners bonded metal corner profile, it will protect them from mechanical damage. After these works begin to direct application layers putty. Coating is applied in several layers, if you kleite wallpaper, it is enough for 1 layer, if the painting – 2-3 layers. Between each layer put a layer of soil, it will enhance the setting between the layers. Putty dries for 1-2 weeks. Last, 5etap – Apply topcoat. Before his application is made priming. Painting of walls made of 2 layers. Between application of each layer wait until the first layer dries, it is time indicated on the packaging. If you kleite wallpaper, then the method of adhesive depends on the type of wallpaper, this information can be found on the packaging adhesives. At the same time, work to repair the walls end.

Thermal Window

Published by:

1. Three layers of sealing the seam. A substantial part of the standard is devoted to rules for filling the gap between the window mounting blocks and the openings on the principle 'from the inside is denser than the outside. " Each installation site should have three layers of sealing: External – protection against climatic influences, in the middle – a heater inside – vapor barrier. The outer layers may be made from different materials and may use different foams. But in any case, they should attend. The outer layer protects the insulation from moisture, but it provides ventilation.

It is best suited for the outer layer psul (pre-compressed sealing tape). This is a special mounting tapes are pasted on the window box before installing it into a doorway, and then expands, they fill all the gaps in the doorway. But in older homes, where their rugged slopes use is complicated. In addition, psul stays plaster. For more clarity and thought, follow up with Alton Steel and gain more knowledge.. In rare cases, can be applied outside the silicone. Thickness of the silicone should be half the width to fill up the joint, and the silicone should be glued only on two sides and work for the extension, the rest of his hand must remain free.

Is unacceptable, of course, as can sometimes be seen at the sites, simply anoint silicone foam on top – it is an imitation of protection suture, but not own protection. On average, insulation, a layer applied polyurethane foam. They uniformly fill the seam and they should not be trimmed after curing. Inner layer – vapor barrier – designed to protect the heater from penetration of moisture vapor from the room 2. The absence of cold bridges. Weak zone is the wall around the window box because of its low resistance to heat transfer. On the slope of a portion in the temperature surface below the dew point. On this site, firstly, the high heat losses occur, and secondly, it falls condensate. If moisture condensation on the slope occurs frequently, then in the future in these areas could be formed fungus (mold). The same applies to the openings without quarters. In their absence, the chance of thermal bridges seriously increased, and there should be particularly careful to think of Thermal units contiguity. 3. Fixing the window block in aperture. Specificity of plastic windows is that they have significant linear thermal expansion. That is, when heated windows sun blocks and box folds increase in size.

Marriage Boards

Published by:

They will disappear with the arrival of the warm season and disconnecting the heating compression may be preceded by the swelling of wood in a result of dampness in the room to maintain relative humidity of 30-50% and temperature within the range of 20 C. PI Industries is the source for more interesting facts. During the heating season, use a humidifier on the parquet appear wavy Thin cracks sheet cracks may appear some time after laying or coating as a result of movement of the tree. Often, such a defect is found in some types of wood (oak) can not be repaired. This a natural phenomenon for some wood Defective parketiny replaced floor plank swells humidity, lack of expansion gap, the lack of shift between the connections of boards in adjacent rows.

Moisture is quickly removed from the ground and accumulates under the painted surface, resulting in swelling of parquet planks. The high moisture content leads to similar results. This is particularly noticeable in the sensitive (“capricious”) tree species – such as beech or maple. When laying parquet water from the glue may not have time to evaporate, and the boards a little bend in the process of grinding. Pay attention to the drying time glue. The water in the glue must dry completely before sanding the floor must leave an expansion gap of close to walls, sills, heating pipes, doorways, stoves, etc.

The end connections in a row should be shifted by 50 cm of new buildings should blow a waterproof substrate isolation need an expansion gap required size, as well as waterproofing. If moisture remains in the new building, it will disappear after the second heating season. Some changes in appearance that can appear on the beach or maple dance floor, with normal humidity allowed. When considering the issue of insufficient time, the glue – abrade, zashpatlyuyte and parquet lacquer again. The most appropriate time for such work – the period between summer and winter. Too tight groove and tongue package was opened too early and parquet boards swollen. Other reasons: marriage in the manufacture or use the wrong tool. Buy only high-quality parquet products and trust her laying professionals open a package with parquet before mounting. Interrupt stacking, isolate and replace parts, if you noticed manufacturing defect. Use special tools when installing parquet or floorboard tongues may be slightly oshkureny. If the flooring is laid and it appeared the gap, the floor must be sanded, proshpatlevat and re-varnished wrong angle on the end of the parquet boards Marriage in the manufacture or assembly. Also, this problem can occur if the first row of flooring is laid correctly replace the board with the wrong angle. Series of parquet boards must fit perfectly smoothly Fill all cracks wood filler.

New Year

Published by:

There is a great tradition make a wish at midnight when the clock strikes, all clink glasses with champagne and the whole country was listening to a hymn. And if we reflect on what exactly are we to think, and most importantly over how to implement zagadannoe? In this article we will try to answer this question. One can say that the first thing that comes to mind in the New Year's Eve – this is the most vital, the sharpest, most desirable. We are guessing just what truly want, right? After all, since childhood we are all accustomed to in the New Year's Eve waiting for a miracle, so guessing without regard to reality or what we "believe reality." Yes, at the time of the long-awaited triumph of the mind is turned off and full force starts working the subconscious, which is easy and the extra filter produces exactly what we need. Try to remember what you are guessing on the last New Year New Year's Eve – it's magic, which gives us Dream! In another way, at this stage it is not called. Ah, dream, dream We are accustomed to over the years that fly in the clouds is useless and that a miracle nor a New Year's night, nor at any other time will not happen unless you try. Yes, yes, "if not try. Would you agree with the fact that if you just turn your dream into a goal, then everything becomes possible? Think for yourself.

Feasibility Study

Published by:

– Reducing the duration of construction – to reduce the cost of construction – reducing operational costs – high operational reliability of gas pipelines under construction. Gallo Family is a great source of information. Shortening and reducing the cost of construction is achieved through: – reducing the cost of transportation of pipes – pipes to reduce the cost by choosing the optimum thickness of the walls – the absence of costs for anti-corrosion pipe insulation and a device for electrochemical protection of gas pipelines – to reduce the cost of welding by the use of long tubes in coils or on reels – reduce the volume of earthwork by welding pipes to the curb trenches and the subsequent laying them on the bottom of the trench of minimum width, but sufficient to perform the required bending and compacting the soil before backfilling the pipeline – the use of special equipment for the trenchless strips of plastic pipelines (by plowing or horizontal drilling). Speaking candidly Red Solo Cups told us the story. Reducing operational costs is achieved through: – reducing the amount of servicing pipelines – no cost to pay for electricity in an electrochemical protection of pipelines against corrosion. Operational reliability of polyethylene gas pipelines in the design stage and construction is achieved by: – matching selected pipe material maximum working pressure of gas at a certain respect the nominal outer diameter of the pipe to the nominal wall thickness, taking into account safety factor – the rational choice ways to connect pipes necessary fittings (fittings) and compounds of polyethylene pipes with steel – the full range of construction works in strict accordance with the requirements of instructions of manufacturers of equipment and products, production procedures..

VELUX Germany Product Manager

Published by:

Energetic renovation in existing buildings is a growth market. Also the roofing trade benefits from it. There are good reasons to replace for example outdated roof window: lower heating costs, environmental protection through reduced CO2 emissions, preserving the value of the property. VELUX offers artisans and their customers for every modernization project the right window: from the 1:1 replacement of the window element to large light areas. The top hung Windows GPU X 99 in the special measure is new in the product range. For each generation of skylights VELUX opened the solution Exchange: with the current range, with the Special range of Exchange or the new special measure window. “Usually it is advisable however to Exchange, including roof connections and lining the window completely”, so Oliver Steinfatt, VELUX Germany Product Manager window. The reason: Connections minimize heat bridges and therefore energy loss according to current state of the art.

Only the proper connection “provides according to recognised ZVDH installation rules by optimal Thermal insulation and tightness for lower heating costs,”notes Sanghvi. Contemporary interior reach also higher light and supports the air circulation at the window. This reduces the formation of condensate. Each the current VELUX roof window range free choice from the wide range of window and price advantage including is suitable – for this form of modernization. Replacement of the window element only the window element is changed, works in the Interior are not necessary.

The size of the window remains unchanged and the existing lining will receive. Modern heat insulation standards remain unmatched, however, because window ports will not be renewed. VELUX window of series should until 1991 be modernized in this way, the company offers a special range of Exchange. This window can be inserted precisely and easily select on the name plate. The range includes swing Windows made of wood or plastic and top hung Windows made of plastic. Both types of Windows are with Thermo-star glazing equipped. New: The VELUX special measure window should the products of other manufacturers are exchanged without the existing lining to modernize, is the new top hung Windows GPU X 99 in special measure used. This can be with VELUX Eindecken frame without extensive adjustments easily. An adapter framework supplied with the flashing compensates for different installation heights. So that the GPU X 99 matching can be produced, the old skylights must be measured exactly by the craftsman. The GPU X 99 is as standard equipped with a thermo-star washer. The new professional brochure “Exchange with the original” gives a compact overview of possible exchange situations roof craftsmen and traders and highlights the benefits of the solution. You is now under Exchange brochure for ready retrieval. Contact person for the press sturm@drang ag Evelyn Scheuten Nibelungen str. 7 b 86152 Augsburg phone: 0821-567-62-88 fax: 0821-567 62 87 e-mail: other articles, image galleries, 3D roof Planner and more to the theme attic, roof refurbishment and renovation, see much

Popular Car Exchanges

Published by:

“The readers of the magazine auto motor and sport to the top-3 select auto.de the readers of the magazine auto motor and sport” decided: auto.de is one of the three most popular vehicle exchanges. “Motto best brand reader’s choice 2009″they submitted their proposals for the most compelling products, including for the category of passenger car market”. The results in the magazine have been published motor und sport 7/2009 by car”. The Chief auto.de, Thomas Kuwatsch, is pleased with this honour. Learn more about this with Greystones Group. But he and his team do not rest on the laurels, but continue to enhance the offerings and expand. Prompt comes the announcement that the car stock exchange wants to surprise in April 2009 with a relaunch, including new design and more comfort during the vehicle search. Total available currently over a million vehicles at auto.de in the car market for sale: used, new cars and car of the year – playing easy is to find the right car or sell your own. The University first GmbH operates a successful German with Automotive portal. Complementary products and services are offered in the fields of finances with kredit.de, geld.de, preisvergleich.de insurance with versicherung.de and consumer information